Question:
1. How do you control foreign body in products?
A: The semi-product pre-inspection when arrived, checking record required. During the mass production and packing, we have paper rules to attention workers and QC pays full attention to a foreign body in products, if found, must be treated immediately.
2.Do you have a pest control system in place? If yes, is it managed internally or subcontracted?
A: Yes do pest control here, it's internally. 7-9 times per 6 working days inspection required. No infestation during the last six months.
3.How do ensure continuity of supply of products during a natural disaster, and or force-majeure?
A: For log, we have two production base in Russia to ensure a continuous supply of log and most of the semi-products, in 3-5 years, we are statable in raw materials.
Shipping
Material in stock can be produced mass production about 5-20days right away, after pre-payment confirmation, COSCO Mearsk MSC shio to worldwide for safe shipping, don't worry about package damage or loss. It takes about 15-40days to worldwide. Please kindly note us your contact details include your phone number for easy contacting from shipping company quotation.
By sea
|
Delivery from Shanghai/Shenzhen Or ningbo seaport |
By air
|
Departure from Shanghai Putong airport or Hongkong |
By express
|
Post by DHL, SF,EMS, UPS,TNT |